Photovoltaic voltage regulation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9184594
APP PUB NO 20120306279A1
SERIAL NO

13152787

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A photovoltaic system includes: a photovoltaic generator comprising strings that each includes one or more photovoltaic cells; a power converter; switches; and a controller. The power converter is configured to convert direct current (DC) power provided by the photovoltaic generator into alternating current (AC) power, and to output the AC power. Each switch is associated with one of the strings and is configured to connect the associated string to the power converter when set to a first setting, such that power generated by the first string can flow to the power converter. Each switch is also configured to disconnect the string from the power converter when set to a second setting. The controller is configured to control the power provided by the photovoltaic generator by selectively connecting the strings of the photovoltaic generator to the power converter by controlling the settings of the switches.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XANTREX TECHNOLOGY INC161-G SOUTH VASCO ROAD LIVERMORE CA 94551

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Garabandic, Djordje Burnaby, CA 7 134

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00