Advanced coal upgrading process for a power station

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9187697
APP PUB NO 20110314730A1
SERIAL NO

13148945

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coal or carbonaceous material upgrading process for power station use, the process comprising a number of steps. First comminuting the coal or carbonaceous to a comminuted material. Second pre-treating the comminuted coal with a pulsing single frequency microwave and vacuum to reduce its water and oxygen content; the pre-treating stage being carried out at a temperature of up to 180 C. Third, treating the pre-treated comminuted material with a pulsing single frequency microwave energy under vacuum to optimize the volatile organic materials; the treatment stage being carried out at a temperature of up to 350 C. Next pyrolyzing the treated coal with a pulsing single frequency microwave and vacuum to produce a hot gas and a solid carbon residue; the pyrolyzing stage is carried out at a temperature of up to 720 C. The solid carbon residue can then be separated from the hot gas, the volatile organic materials condensed to produce a liquid hydrocarbon product and a gas product; and the solid material and the gas product fed to a power station to produce electricity therefrom. The microwave energy applied at each of the stages has a single frequency of 100 megahertz to 300 gigahertz, has circular polarisation, and is pulsed at a frequency of 2 to 50 kilohertz. The pre-treatment step, the treatment step, and the pyrolysis step can be done under vacuum.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOMEZ RODOLFO ANTONIO M8 TRANSPORT AVENUE NETLEY SOUTH AUSTRALIA 5037 AUSTRALIA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gomez, Rodolfo Antonio M Brompton, AU 17 227

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00