Electric drive unit for construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9187880
APP PUB NO 20140052350A1
SERIAL NO

14113921

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric drive unit for a construction machine is capable of increasing the operating time of the construction machine. The electric drive unit has an electricity storage device, a hydraulic pump of variable displacement type which is driven by a motor/generator, a regulator which performs variable control on the displacement volume of the hydraulic pump, a bidirectional converter which performs variable control on the revolution speed of the motor/generator, and an LS control device which controls the regulator and the bidirectional converter so that LS differential pressure Pls equals a target value Pgr. The bidirectional converter performs regeneration control for converting the inertial force of the rotor of the motor/generator into electric power thereby charging the electricity storage device when the revolution speed of the motor/generator is decreased in response to an excess of the LS differential pressure Pls over the target value Pgr.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY TIERRA CO LTDKOKA-SHI SHIGA 528-0061

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kurikuma, Hajime Koka, JP 14 155
Takahashi, Kiwamu Koka, JP 78 336
Takishita, Tatsuo Koka, JP 15 131
Tsuruga, Yasutaka Moriyama, JP 68 327

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00