Multistage pressure condenser and steam turbine plant equipped with the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9188393
APP PUB NO 20120216541A1
SERIAL NO

13239621

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pressure bulkhead has a plurality of holes and divides a low-pressure chamber at low pressure in the vertical direction. A cooling-tube bank is located in an upper section of the low-pressure chamber and performs heat exchange with low-pressure steam guided to the low-pressure chamber by introducing coolant therein to condense the low-pressure steam to low-pressure steam condensate. A reheat chamber serves as a lower section of the low-pressure chamber and stores the low-pressure steam condensate falling from the holes in the pressure bulkhead. A high-pressure-steam introducing unit introduces high-pressure steam within a high-pressure chamber at high pressure to the reheat chamber. A plurality of plate members are parallel to each other below the pressure bulkhead and extend in a falling direction of the condensate falling from the holes in the pressure bulkhead.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HITACHI POWER SYSTEMS LTD3-1 MINATOMIRAI 3-CHOME NISHI-KU YOKOHAMA KANAGAWA 220-8401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujita, Issaku Tokyo, JP 15 81
Hiraoka, Satoshi Tokyo, JP 71 418
Kasahara, Jiro Tokyo, JP 18 95
Tanimoto, Koichi Tokyo, JP 57 78
Utsumi, Seiho Tokyo, JP 2 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00