Photomask blank, method for manufacturing photomask, and method for manufacturing phase shift mask

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9188852
APP PUB NO 20130309601A1
SERIAL NO

13892557

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A light-shielding film 2 formed on a transparent substrate 1 has a monolayer structure or a multilayer structure. At least one layer is formed by film-formation with a chromium-containing material including tin. The light-shielding film 2 has an optical density of 2 or higher and 4 or lower and has a reflection-preventing function. The layer made of a chromium-containing material including tin, which constitutes the light-shielding film 2, can cause a significant increase in the etching rate at the time of chlorine-containing dry etching including oxygen. Thus, burden on the resist pattern or hard mask pattern at the time of transferring a pattern on the light-shielding film is reduced, and therefore it is possible to carry out pattern transfer with high precision.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIN-ETSU CHEMICAL CO LTD4-1 MARUNOUCHI 1-CHOME CHIYODA-KU TOKYO 100-0005

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukaya, Souichi Niigata, JP 21 73
Nakagawa, Hideo Niigata, JP 115 1603
Sasamoto, Kouhei Niigata, JP 24 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00