Adaptive real-time power and performance optimization of multi-core processors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9189057
APP PUB NO 20140025972A1
SERIAL NO

14041065

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus, method, and program product for optimizing core performance and power in a multi-core processor. The apparatus includes a multi-core processor coupled to a clock source providing a clock frequency to one or more cores, an independent power supply coupled to each core for providing a supply voltage to each core and a Phase-Locked Loop (PLL) circuit coupled to each core for dynamically adjusting the clock frequency provided to each core. The apparatus further includes a controller coupled to each core and being configured to collect performance data and power consumption data measured for each core and to adjust, using the PLL circuit, a supply voltage provided to a core, such that, the operational core frequency of the core is greater than a specification core frequency preset for the core and, such that, core performance and power consumption is optimized.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Daeik San Diego, US 64 551
Kim, Jonghae San Diego, US 314 3456
Kim, Moon J Wappingers Falls, US 169 2596
Moulic, James R Anchorage, US 40 597

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00