Cross-talk noise computation using mixed integer linear program problems and their solutions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9189584
APP PUB NO 20150046892A1
SERIAL NO

13970695

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes forming a mixed integer linear problem (MILP) capturing at least a plurality of timing windows over which aggressor net(s), electromagnetically coupled to a victim net in a circuit, produce computed cross-talk noise pulses potentially contributing to a maximum noise for the victim net. The MILP is solved to determine the maximum noise at the victim net. Responsive to the maximum noise meeting one or more criteria, at least an indication of the victim net is output. Forming may include forming a linear problem using overlapping timing windows for which noise pulses contribute to the maximum noise and converting the linear problem to the mixed integer linear problem by introducing into the linear problem binary variables that determine whether individual ones of overlapping or non-overlapping noise pulses from the one or more aggressor nets contribute to the maximum noise. Apparatus and program products are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feldmann, Peter New York, US 41 464
Zolotov, Vladimir Putnam Valley, US 80 1101

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00