Station for a cable railway system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9193360
APP PUB NO 20140069292A1
SERIAL NO

13966918

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cable railway installation has an endless conveying cable extending between terminal stations. Transport vehicles, such as chairs or gondolas, are coupleable to the conveying cable. In the two terminal stations the cable is guided over headwheels and, in optionally provided intermediate stations, it is guided over diverting pulleys, diverting rollers or the like. The transport vehicles entering the terminal stations are uncoupled from the conveying cable, conveyed through the stations by guide tires and then coupled to the conveying cable for exiting the stations. A load bearing structure, which carries components such as the headwheels, diverting pulleys and rollers, and the guide tires, is borne by at least one support disposed centrally between the paths of motion of the transport vehicles. An ascent leads up to the load bearing structure. The support carrying the load bearing structure is formed with a through passage through which the ascent is routed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INNOVA PATENT GMBHKONRAD-DOPPELMAYR-STRASSE 1 WOLFURT 6922

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duer, Gerd Bildstein, AT 3 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00