Processes and systems for conversion of alkyl bromides to higher molecular weight hydrocarbons in circulating catalyst reactor-regenerator systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9193641
APP PUB NO 20130158324A1
SERIAL NO

13705106

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Process and system that include the conversion of alkyl bromides to higher molecular weight hydrocarbons in circulating catalyst reactor-regenerator systems. Alkyl bromides may be reacted over a catalyst in at least one conversion reactor to produce at least an effluent stream comprising higher molecular weight hydrocarbons and hydrogen bromide. A portion of the catalyst may be removed from the conversion reactor. The portion of the catalyst may be contacted with a stripping gas to displace hydrocarbons from the portion of the catalyst. The portion of the catalyst may be contacted a first inert gas. The portion of the catalyst may be contacted with oxygen to form a regenerated catalyst by removal of coke. The regenerated catalyst may be contacted with a second inert gas. At least a portion of the regenerated catalyst may be introduced into the conversion reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SULZER MANAGEMENT AGWINTERTHUR SWITZERLAND WINTERTHUR ZURICH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Moore, Patrick K Houston, US 3 30
Thomas, Raphael Houston, US 4 53
Waycuilis, John J Cypress, US 43 1021

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00