Method for producing modified conjugated diene-based polymer, modified conjugated diene-based polymer, and modified conjugated diene-based polymer composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9193807
APP PUB NO 20130023624A1
SERIAL NO

13639145

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a modified conjugated diene-based polymer having a good balance between the hysteresis loss properties and the wet skid resistance, practically sufficient abrasion resistance and breaking strength, and high processability when formed into a vulcanized product is provided. A method for producing a modified conjugated diene-based polymer, comprising: a polymerization step of polymerizing a conjugated diene compound, copolymerizing conjugated diene compounds, or copolymerizing a conjugated diene compound with an aromatic vinyl compound using an alkali metal compound or an alkaline earth metal compound as a polymerization initiator to obtain a conjugated diene-based polymer having an active end, and a modifying step of reacting a compound represented by following formula (1) with the active end of the conjugated diene-based copolymer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ASAHI KASEI CHEMICALS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuda, Takaaki Tokyo, JP 30 439
Sekikawa, Shinichi Tokyo, JP 15 101
Yoshida, Junichi Tokyo, JP 105 1825

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00