Method and installation for producing supplementary electrical energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9194360
SERIAL NO

14215548

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An installation for producing supplementary electrical energy for an electricity network includes at least first and second water reservoirs, the first water reservoir (311, 312) being situated at a first level and the second water reservoir (120) being situated at a second level lower than the first level, a communicating pipe (340) between the first water reservoir (311, 312) and the second water reservoir (120) being provided with a remote-controlled valve (350), and a hydro-electric generating system (330) being provided with a pumping installation. The first and/or second water reservoir (311, 312; 120) is integrated in the foundations in the lower portion of an artificial building (301, 303; 200A) that needs to be built for a primary function independently of a secondary function of producing electricity. The first water reservoir (315) or the second water reservoir (120) may constitute a common body of water in the vicinity of ground level. The water reservoirs (311, 312; 210; 220) integrated in foundations of buildings may in particular cooperate with installations for air-conditioning or heating the buildings at the base of which they are constructed, or associated buildings.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NATURE AND PEOPLE FIRST

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Payre, Denis Paris, FR 8 101
Pisterman, Patrice Nancy, FR 2 20
Pisterman, Pierre Paris, FR 2 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00