Optical device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9195114
APP PUB NO 20140161387A1
SERIAL NO

14119853

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is directed to the provision of an optical device in which provisions are made to form a gap between an optical waveguide and a substrate without having to form a groove or the like in the substrate and to prevent any stress from being applied to an optical element even when it is heated by a heater for temperature adjustment. More specifically, the invention provides an optical device includes a substrate, an optical element with an optical waveguide formed in a surface thereof that faces the substrate, bonding portions formed on the substrate at positions that oppose each other across the optical waveguide, a heater, formed on at least one of the optical element and the substrate, for heating the optical waveguide, and a micro bump structure formed from a metallic material, wherein the optical element is bonded to the bonding portions via the micro bump structure in such a manner that a gap is formed between the optical waveguide and the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CITIZEN HOLDINGS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Yosuke Fuchu, JP 9 41
Ide, Masafumi Tokorozawa, JP 56 1126
Nozaki, Takaaki Iruma, JP 17 88
Yoda, Kaoru Nagano, JP 15 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00