Method of manufacturing honeycomb structured body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9199188
APP PUB NO 20140352870A1
SERIAL NO

14459317

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a method of manufacturing a honeycomb structured body, a ceramic block is formed by binding multiple pillar-shaped honeycomb fired bodies with adhesive layers interposed therebetween. The multiple pillar-shaped honeycomb fired bodies are bound on a support by piling up the multiple pillar-shaped honeycomb fired bodies successively. A placing position where a primary honeycomb fired body is to be placed is determined. A position of an end face of at least one secondary honeycomb fired body is fixed by applying force to the end face of the at least one secondary honeycomb fired body. The primary honeycomb fired body is placed on the placing position with the position of the end face of the at least one secondary honeycomb fired body being fixed. The fixing further includes first positioning or second positioning based on a number of the at least one secondary honeycomb fired body before the fixing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IBIDEN CO LTD1 KANDACHO 2-CHOME OGAKI-SHI GIFU 503-8604

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanai, Masanori Ibi-gun, JP 4 33
Sato, Masaya Ibi-gun, JP 23 121
Yamakawa, Yuu Ibi-gun, JP 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00