Robot control device and control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9199373
APP PUB NO 20130085606A1
SERIAL NO

13702147

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A robot control apparatus and a control method for moving a tool along a synthesized trajectory where at least two operations are synthesized in the middle of a desired trajectory. Control positions for a preceding operation and those for a succeeding operation are calculated from initial to terminal values, respectively. With a requirement that initial values for the succeeding operation be matched to terminal values for preceding operation, target control positions at a predetermined time for an actuator in a section where a tool is moved along the synthesized trajectory are calculated on the basis of values obtained by adding values of a difference between the predetermined time and a previous time for the preceding operation to values of a difference between the predetermined time and the previous time for the succeeding operation, and the actuator is controlled such that calculated target control positions are attained.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RORZE CORPORATION1588-2 AZA-MICHINOUE KANNABE-CHO FUKUYAMA-SHI HIROSHIMA 7202104 ?7202104

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tagashira, Ryuma Fukuyama, JP 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00