Heavy hydrocarbon processing in NGL recovery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9200833
APP PUB NO 20130305777A1
SERIAL NO

13946789

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for processing heavy hydrocarbons in an NGL recovery system is provided. In one embodiment, a feed stream is separated into a carbon dioxide recycle stream and a heavy hydrocarbon stream. The heavy hydrocarbon stream comprises carbon dioxide and natural gas liquids, and the heavy hydrocarbon stream comprises heavy hydrocarbons. The carbon dioxide recycle stream is separated into a purified carbon dioxide recycle stream and a natural gas liquids stream. The purified carbon dioxide recycle stream comprises the carbon dioxide, and the natural gas liquids stream comprises the natural gas liquids. In another embodiment, a set of process equipment comprises a first separator and a second separator. The first separator is configured to separate a feed stream into a recycle stream and a heavy hydrocarbons stream, and the second separator is configured to separate the recycle stream into a purified recycle stream and a natural gas liquids stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PILOT INTELLECTUAL PROPERTY LLC333 NORTH SAM HOUSTON PARKWAY EAST SUITE 600 HOUSTON TX 77060

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baker, Naomi The Woodlands, US 4 43
Garikipati, Jhansi Houston, US 3 42
Prim, Eric Houston, US 29 175

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00