Plunger press and method for producing compressed bales

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9204596
APP PUB NO 20130047867A1
SERIAL NO

13640664

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plunger press produces compressed bales of forage, straw, biomass or fibrous mass for agricultural and/or industrial use. The press includes a bale case, a reciprocating plunger structure, at least one material feeding duct laterally leading into a material charge feeding section of the bale case, and at least one plunger structure drive mechanism. The plunger structure compresses respective material charges fed from the feeding duct into the bale case. The plunger structure is subdivided perpendicularly to a reciprocation direction of the plunger structure in the bale case into at least two structurally separated compression surfaces. Each of the compression surfaces is smaller than a cross-section area of the bale case. The compression surfaces are driven substantially parallelly in the reciprocation direction and with a time shift in relation to each other to alternatingly compress material on partial surfaces of the cross-section area.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KUHN-GELDROP B V5667 KP GELDROP

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Van, De Laarschot Marijn PK Geldrop, NL 3 23
Wondergem, Matthijs Johannes VS Oost-Souburg, NL 1 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00