Fuel cell mixed power supply energy management method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9216661
APP PUB NO 20150056477A1
SERIAL NO

14364328

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention provides a kind of mixed power supply energy management method for fuel battery, including the following steps: initialization; control the output current of DCDC converting unit according to the measured energy storage device voltage and the actual current outputted by the DCDC converting unit, respond to the energy need resulting from load condition change and at the same time ensure the energy storage device to be in a best charge state; send a current setting instruction to the DCDC converting unit. This invention does not adopt the SOC calculation mode any more, the system no longer relies on the accuracy, reliability of current sensor; and this invention is strongly compatible, highly reliable, strongly practical and stable in output voltage, with the same system being applicable to more vehicles of different models (forklift) and parameter correction being unnecessary. By correcting battery capacity decrease in advance through setting up parameters in advance, the long-term reliability of the system is ensured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ge, Xuxu Shanghai, CN 6 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00