Efficient high voltage switching circuits and monolithic integration of same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9219058
APP PUB NO 20110210338A1
SERIAL NO

13020243

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high voltage switching circuit includes first and second group III-V transistors, the second group III-V transistor having a greater breakdown voltage than the first group III-V transistor. The circuit further includes a silicon diode in a parallel arrangement with the first group III-V transistor, the parallel arrangement being in cascade with the second group III-V transistor. The circuit is effectively a three-terminal device, where a first terminal is coupled to a gate of the second III-V transistor, a source of the first III-V transistor, and an anode of the silicon diode. A second terminal is coupled to a gate of the first group III-V transistor, and a third terminal is coupled to a drain of the second group III-V transistor. The first group III-V transistor might be an enhancement mode transistor. The second group III-V transistor might be a depletion mode transistor. The first and second group III-V transistors can be GaN HEMTs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INFINEON TECHNOLOGIES AMERICAS CORP101 N SEPULVEDA BLVD EL SEGUNDO CA 90245

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Briere, Michael A Redondo Beach, US 133 1632

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00