Nitride semiconductor structure and method of preparing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9219111
APP PUB NO 20140145147A1
SERIAL NO

14235765

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nitride semiconductor structure of the present invention is obtained by growing an h- or t-BN thin film (12) and a wurtzite-structure AlxGa1-xN (x>0) thin film (14) as buffer layers and forming a single-crystal wurtzite-structure AlGaInBN thin film (13) thereon. While GaN, AlGaN, AlN, and the like have the wurtzite structure with sp3 bonds, h-BN or t-BN has the graphite structure with sp2 bonds, and has a completely different crystal structure. Accordingly, it has heretofore not been considered that a wurtzite-structure AlGaInBN thin film can be grown on a graphite-structure h-BN thin film. However, when a wurtzite-structure AlxGa1-xN (x>0) thin film (14) is formed as a buffer layer on a graphite-structure boron nitride thin film (12), a wurtzite-structure AlGaInBN (13) nitride semiconductor structure such as GaN can be grown on the buffer layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON TELEGRAPH AND TELEPHONE CORPORATIONTOKYO 100-8116

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akasaka, Tetsuya Atsugi, JP 2 243
Kobayashi, Yasuyuki Atsugi, JP 55 236
Kumakura, Kazuhide Atsugi, JP 7 89
Makimoto, Toshiki Atsugi, JP 12 284

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00