Process for regulating joule value of offgases from plants for pig iron production or of synthesis gas

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9222042
APP PUB NO 20140007504A1
SERIAL NO

14005766

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a plant having integrated CO2 removal, for pig iron production or synthesizing gas, at least part of the offgas or synthesis gas is discharged as export gas from the plant, optionally collected in an export gas container and subsequently thermally utilized in a gas turbine. The offgas from the gas turbine is fed to a waste heat boiler for generation of steam. To reduce the addition of high-grade fuel gases, at least part of the tailgas from the CO2 removal plant is mixed into the export gas upstream of the gas turbine as a function of the joule value of the export gas after addition of the tailgas. The proportion of tailgas is increased when the joule value of the export gas goes above a predefined maximum joule value and the proportion of tailgas is reduced when the joule value of the export gas drops below a predefined minimum joule value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRIMETALS TECHNOLOGIES AUSTRIA GMBH4031 LINZ

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Millner, Robert Loosdorf, AT 54 175
Plaul, Jan-Friedemann Linz, AT 14 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00