Supply air terminal device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9222683
APP PUB NO 20110000566A1
SERIAL NO

12821572

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fresh airflow is conducted from a supply air chamber through nozzles into a ring-shaped mixing chamber. A circulated airflow is conducted from a room space into a cylindrical suction chamber inside a ring-shaped heat exchanger. From the suction chamber the circulated airflow travels through the heat exchanger into the mixing chamber. The nozzles are located in the upper part of the mixing chamber at a distance from each other on the periphery of at least one circle, whereby the mid-point of the circle is located on the vertical central axis of the supply air terminal device. The horizontal component of the direction vector of the fresh airflow discharging from each nozzle forms an angle β, which is in a range of 45-135 degrees, with the radius of said at least one circle, and the direction vector is directed downward, in relation to the horizontal plane at an angle α, which is in a range of 15-75 degrees, whereby a rotating airflow directed downward is formed in the mixing chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALTON OY47400 KAUSALA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Paavilainen, Risto Lahti, FI 5 11
Ruponen, Mika Lahti, FI 7 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00