System and method for automated shunt calibration of a sensor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9234768
APP PUB NO 20140245808A1
SERIAL NO

13782713

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sensor assembly may include a Wheatstone bridge with one or more sense elements, an amplifier coupled to the Wheatstone bridge for providing a sensor output signal, a resistor, and a switch for connecting the resistor between the sensor and an adjustable power source output to induce an offset in the sensor output signal. In some instances, a controller may perform an automatic shunt calibration procedure by activating the switch to connect the resistor between the sensor and the adjustable power source output to induce an offset in the sensor output signal. The controller may read the output value and compare the output value with a predetermined value. The controller may adjust the power source output to a value that moves the sensor output value toward the predetermined value. The controller may repeat the reading, comparing and adjusting step until the sensor output value is within a predetermined range of the predetermined value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONEYWELL INTERNATIONAL INC855 S MINT STREET CHARLOTTE NC 28202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beligere, Sudheer Bangalore, IN 9 45
Malhan, Vishal Bangalore, IN 17 70
Pradhan, Mahendra Kumar Bangalore, IN 4 20
Ramamurthy, Gautham Bangalore, IN 18 124

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 12, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00