Electronic compensation of cross-phase modulation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9236951
APP PUB NO 20140286642A1
SERIAL NO

13996562

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical signal (116) is modulated with a transmitted electrical signal comprising an information-bearing component (122) and a pilot tone (120) having a predetermined frequency. Transmission of the signal results in distortion, including nonlinear optical transmission impairments. A method of receiving the signal includes detecting the optical signal to produce a received electrical signal (X) comprising a distorted variant of the transmitted electrical signal. The pilot tone is extracted from the received electrical signal using a filtering operation (308) having a predetermined characteristic, and a compensation signal determined based upon the extracted pilot tone. The compensation signal is applied to the received electrical signal (X) to produce a compensated signal (Y) having reduced distortion. The predetermined characteristic of the filtering operation (308) is represented by one or more parameters having values selected so as to substantially maximize a measure of quality of the compensated signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OFIDIUM PTY. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Du, Liang Bangyuan Victoria, AU 6 107
Lowery, Arthur James Victoria, AU 13 185

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 12, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00