System and method for manufacturing optical display device, set of material rolls and method for manufacture thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9239416
APP PUB NO 20130045350A1
SERIAL NO

13657445

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for manufacturing an optical display device includes providing a roll of a belt-shaped sheet material including an optical film and a release film, which has score lines previously formed by cutting layers of the material other than the release film. The optical film is bonded to a rectangular optical display unit of the display device. In the bonding steps, a first optical film is divided by the score lines into pieces each having a length corresponding to a long side of the display unit, and a second optical film is divided by the score lines into pieces each having a length corresponding to a short side of the display unit. The first optical film has a first polarizing plate whose longitudinal direction is parallel to its absorption axis, and the second optical film has a second polarizing plate whose longitudinal direction is parallel to its absorption axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NITTO DENKO CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kitada, Kazuo Ibaraki, JP 68 865
Koshio, Satoru Ibaraki, JP 55 733
Nakazono, Takuya Ibaraki, JP 80 1495
Yura, Tomokazu Ibaraki, JP 59 817

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 19, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00