Porous geopolymer materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9242900
APP PUB NO 20130055924A1
SERIAL NO

13513220

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Preparing porous materials includes forming a mixture including a geopolymer resin and a liquid between which a nanoscale (1-1000 nm), microscale (1-1000 m), and/or milliscale (1-10 mm) phase separation occurs. The mixture is solidified (e.g., at an ambient temperature or a relatively low temperature), and a portion (e.g., a majority or a significant majority) of the liquid is removed from the solidified mixture. The liquid can include organic liquids from agricultural, geological, industrial, or household sources. The porous materials have accessible pores with a range of pore sizes including nanoscale pore sizes, microscale pore sizes, milliscale pore sizes, or a combination thereof. The porous material may be treated further to form another material, such as a composite.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARIZONA BOARD OF REGENTS A BODY CORPORATE OF THE STATE OF ARIZONA ACTING FOR AND ON BEHALF OF ARIZONA STATE UNIVERSITY1475 NORTH SCOTTSDALE ROAD SKY SONG - SUITE 200 SCOTTSDALE AS 85257-3538

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Medpelli, Dinesh Tempe, US 3 61
Seo, Dong-Kyun Chandler, US 25 201
Seo, Jungmin Tempe, US 27 87

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00