Actuator for a gate of a watercraft jet propulsion system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9248895
SERIAL NO

14473335

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A watercraft has a hull, an engine compartment, an engine disposed and a jet pump. A gate is pivotable relative to the jet pump about a gate axis between an up and a down position. A gate actuator assembly includes an actuator housing fixed to the hull, and an actuator arm movable along an actuation axis with respect thereto. The actuator arm is operatively connected to the gate for pivoting the gate about the gate axis. A sealing member encloses a portion of the actuator arm between the actuator housing and the gate. The sealing member extends between a first end fixed with respect to the actuator housing and a second end fixed with respect to the actuator arm, forming a variable volume outer chamber to prevent entry of fluid therein. A passage fluidly communicating with the outer chamber, extends through the hull into the engine compartment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOMBARDIER RECREATIONAL PRODUCTS INCVALCOURT QUÉBEC J0E 2L0

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gendron, Jean-Philippe Granby, CA 5 31
Quirion, Sebastien Magog, CA 2 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00