Controlled translocation of macromolecules employing a funnel nanopore structure and a gel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9250207
APP PUB NO 20140299473A1
SERIAL NO

14022718

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system of controlled translocation of macromolecules by gel electrophesis employs a funnel nanopore structure. A graphene portion is attached to a porous material layer including funnel-shaped pores such that the graphene portion blocks the side of the porous material layer having openings for smaller pores. A pair of electrical contacts is formed on the graphene portion. A dielectric material layer may be deposited to hold the graphene portion in place. A nanoscale hole is formed through the dielectric material layer and the graphene portion to provide a smallest opening in a funnel nanopore structure. The funnel nanopore structure is placed within a capsule configured for gel electrophoresis. A linear chain of molecules can pass through a funnel-shaped pore and the nanoscale hole during the gel electrophoresis. A graphene nanopore detector allows measurement of blockage current for sufficient resolution of base pairs in DNA's.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Walker, George F New York, US 57 2640

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00