Confirmed divert bitmap to synchronize raid firmware operations with fast-path hardware I/O processing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9250832
APP PUB NO 20140359216A1
SERIAL NO

14284276

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A storage controller system is provided for the monitoring of fast path processing of I/Os to a storage device where the storage controller system allows for processing of I/Os to be monitored through the use of counters in a storage controller based upon the type of I/O issued to the storage controller as well as the conditions associated with the I/O, while providing a bitmap and associated divert bits and counters to monitor the processing of the I/Os in the storage controller. Methods for monitoring the processing of I/Os issued to the storage controller are also provided where the processing of the I/Os is based upon the type fast path I/Os issued to the storage controller and the conditions associated with the issued I/Os while providing a bitmap and associated divert bits and counters to monitor the processing of the I/Os in the storage controller, are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sheffield, Robert L Longmont, US 16 177
Smith, Gerald E Longmont, US 18 420

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00