Ethanol production with two stage continuous steam pre-treatment of lignocellulosic biomass

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9255189
APP PUB NO 20130029406A1
SERIAL NO

13554601

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a method of producing ethanol from lignocellulosic biomass, including a two stage steam pretreatment process. The first stage of the steam pretreatment is carried out by heating the biomass with high pressure steam to a first stage temperature of 140° C. to 180° C. for a first stage time of 30 minutes to 2 hours at a first stage pressure of 105 to 150 psig; and the second steam pretreatment stage is carried out by heating the biomass with high pressure steam to raise the biomass temperature to a second stage temperature of 190° C. to 210° C. for a second stage time of 2 to 10 minutes at a second stage pressure of 167 to 262 psig. Hemicellulose and inhibitors (inhibitory compounds) to downstream hydrolysis and fermentation are preferably removed between the first and second pretreating stages, more preferably after each pretreatment stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GREENFIELD SPECIALTY ALCOHOLS INCTORONTO ONTARIO M5C 2B8

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benech, Regis-Olivier Chatham, CA 11 120
Benson, Robert Ashley Cooper North Bay, CA 17 262
Dottori, Frank A Temiscaming, CA 13 219

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 9, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00