Hybrid construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9255385
APP PUB NO 20150275484A1
SERIAL NO

14626201

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid construction machine according to the present invention includes a controller for controlling an engine with a droop characteristic. The controller includes: a target engine output calculation unit (2-4) that calculates a target output of the engine; a target speed setting unit (2-7) that sets a target speed command of a motor-generator; a target droop calculation unit (2-8) that obtains an intersection point of a constant output line with the target output value of the engine and a constant speed line with the target speed command of the motor-generator on a speed-torque characteristic diagram, and determines a governor characteristic of the engine so that the governor characteristic passes through the intersection point; a governor characteristic changing unit (2-10) that changes the governor characteristic of the engine; and a motor-generator control unit (2-9) that controls the motor-generator in accordance with the target speed command value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HITACHI CONSTRUCTION MACHINERY CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoshino, Masatoshi Tokyo, JP 76 1110
Ishihara, Shinji Tokyo, JP 47 296
Ishikawa, Kouji Tsuchiura, JP 159 1247
Sato, Shinya Tokyo, JP 169 1119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 9, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00