Micro gas turbine engine for powering a generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9267437
APP PUB NO 20140319843A1
SERIAL NO

14190897

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A unique, small microturbine engine adapted to integrate with an electrical generator for producing electrical power has been developed. The microturbine includes an ejector cooling scheme, a prevaporizing combustor, and a combustor air bypass. The ejector cooling scheme uses energy in the hot exhaust gas stream of the microturbine to entrain a flow of ambient air that cools the generator. The prevaporizing combustor of the present invention allows liquid fuel to be vaporized in a small amount of air prior to combustion, thereby increasing combustion efficiency and decreasing combustor size requirements. The combustor air bypass allows a fraction of the compressor discharge air to bypass the prevaporizing combustor under certain operating conditions. This permits control of the overall equivalence ratio and the fuel/air mixing process in the combustion zone, improving efficiency and operability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELECTRIC JET LLCBLACKSBURG VA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Farina, Jordan T Beaverton, US 1 9
Ferrar, Anthony M Christiansburg, US 3 16
LePera, Stephen D Blacksburg, US 1 9
O'Brien, Walter F Blacksburg, US 8 234
Perry, Matthew V Blackburg, US 1 9
Shiver, Samuel Blacksburg, US 1 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00