Method for fabricating a semiconductor package with conductive carrier integrated heat spreader

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9269655
APP PUB NO 20150348887A1
SERIAL NO

14825382

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one implementation, a semiconductor package includes a control conductive carrier having a die side and an opposite input/output (I/O) side connecting the semiconductor package to a mounting surface. The semiconductor package also includes a control FET of a power converter switching stage having a control drain attached to the die side of the control conductive carrier. The control conductive carrier is configured to sink heat produced by the control FET into the mounting surface. The semiconductor package includes a sync conductive carrier having another die side and another opposite I/O side connecting the semiconductor package to the mounting surface, and a sync FET of the power converter switching stage having a sync source attached to the die side of the sync conductive carrier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INFINEON TECHNOLOGIES AMERICAS CORP.;INTERNATIONAL RECTIFIER CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Eung San Torrance, US 116 554
Cutler, Daniel Betchworth, GB 20 89
Pavier, Mark Felbridge, GB 57 731
Sawle, Andrew N East Grinstead, GB 25 176

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00