Cellulose resin film, process for producing cellulose resin film, antireflection film, polarizing plate, and liquid crystal display

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9272448
APP PUB NO 20080246189A1
SERIAL NO

12092016

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cellulosic resin film which is wide and, despite this, is extremely reduced in breakage during a stretching step; a process for producing the film; and an antireflection film, a polarizer, and a liquid-crystal display each comprising or employing the film. The process for cellulosic resin film production comprises casting a liquid cellulosic resin on a support to form a web, peeling the web from the support, subsequently drying the web in a first edge gripping step (105) while gripping both edges, temporarily eliminating the edge gripping, and then stretching both edges in the width direction in a second edge gripping step (109). The process is characterized in that the first edge gripping step is followed by a heat treatment step in which both edge parts of the web relieved from the edge gripping are heated with heating rolls (107 and 108).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KONICA MINOLTA OPTO INCHACHIOJI-SHI TOKYO 192-8505

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuzuhara, Noriyasu Tokyo, JP 33 562
Murakami, Takashi Tokyo, JP 234 2395

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00