Method for processing a plurality of data and switching device for switching communication packets

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9282064
APP PUB NO 20120275460A1
SERIAL NO

13511823

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention concerns a method of processing a plurality of data packets in a packet switched communication network comprising at least one switching device (1) as well as a corresponding switching device. The switching device (1) comprises two or more sub-engines (21, . . . , 29). A control unit (7) of the at least one switching device (1) receives a data packet comprising a header (10) of a communication packet exchanged via the communication network. The control unit (7) applies at least one filter operation (50) to the header (10) and generating thereby filtered information (100). The control unit (7) maps the filtered information (100) on a hash-tag (30) according to a hash-function (300). The control unit (7) provides a tagged-header (11) by means of inserting the hash-tag (30) in the header (10) of the data packet. The control unit (7) sends the data packet to a sub-engine (24) of the two or more sub-engines (21, . . . , 29) according to the tagged-header (11) for further processing of the data packet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • WSOU INVESTMENTS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Klotsche, Ralf Neuenbürg, DE 19 401
Tangemann, Michael Leonberg, DE 9 363

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00