Energy and yield-optimized method and plant for producing hot steel strip

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9289807
APP PUB NO 20130186588A1
SERIAL NO

13877429

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is disclosed for continuously or semi-continuously producing hot steel strip which, starting from a slab guided through a slab-guiding device, is rolled in, for example, an at least four-stand roughing train to form an intermediate strip and, in a further sequence in a finish rolling train, into a final strip. The thickness of a slab cast in a die is reduced in the liquid core reduction process by means of the adjoining slab-guiding device to between 85 and 120 mm, a slab support length measured between the meniscus, i.e., the bath level, of the die and an end of the slab-guiding device facing the roughing train being at least 18.5 m, a casting speed ranging from 3.8 to 7 m/min, and slabs of different thicknesses being cast as a function of given casting speeds. Using the disclosed casting parameters, high-quality finishing may be provided with high production capacities.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRIMETALS TECHNOLOGIES AUSTRIA GMBHTURMSTRASSE 44 LINZ 4031

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eckerstorfer, Gerald Leonding, AT 20 91
Hohenbichler, Gerald Kronstorf, AT 51 184
Watzinger, Josef Reichenau, AT 8 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00