Extrusion-to-sheet production line and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9296146
SERIAL NO

13772613

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Extrusion-to-sheet production line and method comprise first and second rolls set to a predetermined gap through which a continuously-extruded sheet of molten plastic material passes to calender the sheet to a predetermined thickness. The sheet then passes through a nip formed between the second roll and a continuous belt looped around a third roll and a fourth roll spaced from one another. The belt comprises an embossing pattern of optical element shapes that is an inverse pattern of optical element shapes to be embossed at a first major surface of the sheet. The sheet remains in contact with the second roll until the sheet passes through the nip, where the pattern of optical element shapes on the belt is embossed into the first major surfaces of the sheet. Downstream of the third roll is a flat cooling area through which the belt passes while the first major surface of the sheet is still in contact with the embossing pattern on the belt. Downstream of the flat cooling area is a separation area where the belt separates from the sheet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RAMBUS DELAWARE6611 WEST SNOWVILLE ROAD BRECKSVILLE OH 44141

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Thielman, W Scott Palatine, US 13 248

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00