Pattern-forming method, and radiation-sensitive composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9298090
APP PUB NO 20150177616A1
SERIAL NO

14640882

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pattern-forming method includes providing a resist film on a substrate using a radiation-sensitive composition. The resist film is exposed. The exposed resist film is developed using a developer solution. The developer solution includes no less than 80% by mass of an organic solvent. The radiation-sensitive composition includes at least two components including a first polymer and a radiation-sensitive acid generator. The first polymer includes a structural unit having an acid-labile group. One or more components of the radiation-sensitive composition have a group represented by a formula (1). Arepresents —N—SO2—RD, —COO, —Oor —SO3. —SO3does not directly bond to a carbon atom having a fluorine atom. RD represents a linear or branched monovalent hydrocarbon group, or the like. X+ represents an onium cation.

description='In-line Formulae' end='lead'-A X+  (1)description='In-line Formulae' end='tail'

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JSR CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furukawa, Taiichi Tokyo, JP 29 100
Hori, Masafumi Tokyo, JP 27 116
Ito, Koji Tokyo, JP 354 3746
Sakakibara, Hirokazu Tokyo, JP 40 195

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00