Method for manufacturing stone material using molten slag

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9302939
APP PUB NO 20130175736A1
SERIAL NO

13820569

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a reconstituted stone raw material by using a molten slag includes: controlling a temperature of the molten slag at 1400° C.-1500° C., and performing a cast-molding process on the molten slag; and maintaining the cast-molded slag at a temperature of 800° C.-1000° C. for 1-5 hours in a non-reducing atmosphere, and then gradually cooling the cast-molded slag to a room temperature within 2-5 hours to obtain the reconstituted stone raw material. An energy-saving and efficient method for comprehensively utilizing the blast furnace slag is provided. The produced reconstituted stone raw material has such characteristics as stable color quality, abrasion resistance, pressure resistance, strong adhesiveness, low coefficient of expansion and low shrinkage ratio.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHANDONG COKING GROUP CO LTD255000 NO 97 LIU QUAN ROAD SHANDONG ZIBO ZIBO CITY SHANDONG PROVINCE 255000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gong, Benkui Shandong, CN 3 1
Li, Yueyun Shandong, CN 5 2
Ming, Jun Shandong, CN 15 28
Wang, Qingtao Shandong, CN 7 2
Wei, Zhenxia Shandong, CN 3 1
Yu, Xianjin Shandong, CN 3 1
Zhao, Xin Shandong, CN 1071 7724

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00