Air conditioner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9303908
APP PUB NO 20090151374A1
SERIAL NO

12096806

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air conditioner includes a refrigerant circuit configured to interconnect a heat source unit and a utilization unit, a transmission line that exchanges a signal between the heat source unit and the utilization unit, an information obtaining section, an operation controlling section capable of performing a refrigerant quantity judging operation, a refrigerant quantity judging section, and a condition setting section. The information obtaining section obtains information on the utilization unit connected to the heat source unit via the transmission line. The refrigerant quantity judging section judges the adequacy of the refrigerant quantity in the refrigerant circuit by using the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit in the refrigerant quantity judging operation. The condition setting section sets a condition for the refrigerant quantity judging operation according to the information on the utilization unit obtained by the information obtaining section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DAIKIN INDUSTRIES, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kasahara, Shinichi Sakai, JP 54 466

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00