Photoconductive antenna, terahertz wave generating device, camera, imaging device, and measuring device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9306112
APP PUB NO 20130153765A1
SERIAL NO

13717835

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A photoconductive antenna is adapted to generate terahertz waves when irradiated by pulsed light. The photoconductive antenna includes first and second conductive layers, a semiconductor layer positioned between the first and second conductive layers, first and second electrodes, and a dielectric layer. The semiconductor layer is made of a semiconductor material having a carrier density that is lower than a carrier density of the semiconductor material of the first conductive layer or the second conducive layer. The first and second electrodes are electrically connected to the first and second conductive layers, respectively. The second electrode has an aperture through which the pulsed light passes. The dielectric layer is made of a dielectric material, and is in contact with a surface of the semiconductor layer having a normal direction extending orthogonal to a lamination direction of the first conductive layer, the semiconductor layer, and the second conductive layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEIKO EPSON CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tomioka, Hiroto Nagano, JP 21 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00