Method of purification of biomass syngas under positive pressure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9309115
APP PUB NO 20150041719A1
SERIAL NO

14314000

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for purifying biomass syngas under a positive pressure. The method includes: 1) aerating a pyrolysis gasifier by using an oxidation fan; 2) introducing syngas produced in the pyrolysis gasifier through a water-cooling flue to a water-cooling quench tower; 3) introducing the syngas from the water-cooling quench tower to a waste heat boiler of a water-tube type and a waste heat boiler of a heat-tube type; 4) introducing the syngas from the waste heat boiler of the heat-tube type to a Venturi scrubber in the absence of a filler to wash the syngas and remove dust; 5) introducing the syngas from the Venturi scrubber to a wet electrical dust precipitator for further removing the dust; and 6) transporting qualified syngas to a wet gas tank for storage or to a downstream process for use.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WUHAN KAIDI GENERAL RESEARCH INSTITUTE OF ENGINEERING & TECHNOLOGY CO LTDKAIDI BUILDING T1 JIANGXIA AVENUE EAST LAKE NEW-TECH DEVELOPMENT ZONE WUHAN HUBEI 430223 430223

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Wenyan Wuhan, CN 11 15
Nie, Hongtao Wuhan, CN 8 5
Xia, Minggui Wuhan, CN 11 7
Zhang, Liang Wuhan, CN 689 3734
Zhang, Yanfeng Wuhan, CN 177 515

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 12, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00