Process for acetic acid removal from pretreated biomass

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9309621
APP PUB NO 20140034253A1
SERIAL NO

14111905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The process for treating a ligno-cellulosic biomass feed stream comprised of solids, C5's, C6's, lignin, and water comprises the steps of:

    pretreating the ligno-cellulosic biomass feed stream by contacting the ligno-cellulosic biomass with water in the temperature range of 40 to 210° C. to create a pre-treated ligno-cellulosic biomass comprised of a pre-treatment ligno-cellulosic biomass liquid comprised of suspended solids, C5's, C6's, and acetic acid, wherein the ratio of the C6's to C5's is less than 0.8 to 1.0, and a pre-treated ligno-cellulosic biomass solids;separating a portion of the pre-treatment ligno cellulosic biomass liquid from the pre-treated ligno-cellulosic biomass feed stream;separating a portion of the suspended solids from the pre-treatment ligno-cellulosic biomass liquid using filters, centrifuge or combination thereof, to create a clarified liquid stream, andnano filtering a portion of the clarified liquid stream to create a nano-filtered permeate stream comprised of acetic acid and water and a nano-filtered retentate stream comprised of C5's, C6's, acetic acid and water, wherein the ratio of acetic acid to the total amount of C5's, C6's in the clarified liquid stream is greater than the ratio of the acetic acid to the total amount of C5's, C6's in the nano-filtered retentate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERSALIS S P APIAZZA BOLDRINI 1 SAN DONATO MILANESE (MI) 20097

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Corbellani, Paolo Tortona, IT 2 5
Ferrero, Simone Tortona, IT 34 106

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 12, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00