Group supervisory control device for elevator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9315361
APP PUB NO 20130284542A1
SERIAL NO

13979426

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A group supervisory control device for an elevator includes a hall call assignment portion assigning a specific car to a hall call registered; an operation prediction portion predicting which is the operation to the next hall registered, regenerative operation or power running operation, and the time for which the regenerating operation or the power running operation is performed when the specific car has stopped at a responding hall; and a door open time control portion comparing the time for which the regenerative operation or the power running operation of the specific car is performed with the remaining running time of any other car performing the power running operation or the regenerative operation already predicted, calculating overlap time for the operations simultaneously, and making door open time set for the specific car changed to determine the door open time that can obtain longer overlap time, whereby a door is closed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eto, Masaharu Tokyo, JP 4 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00