Gasification furnace, gasification system, reformer and reforming system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9315746
APP PUB NO 20140053465A1
SERIAL NO

13884108

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gasification furnace for gasifying a biomass resource in a manner producing a low quantity of tar. The gasification furnace (10) is provided with a punching plate (11) partitioning the furnace interior into upper and lower spaces; a biomass resource supply port (10a) for supplying the biomass resource over the punching plate (11); a first oxidizer supply port (10c) and a second oxidizer supply port (10d) for supplying an oxidizer into the furnace; a first oxidizer supply path supplying the oxidizer from the first oxidizer supply port (10c) from above towards below the punching plate (11); a second oxidizer supply path distributing and supplying to a plurality of locations within a predetermined area in the vicinity of the punching plate (11) from the second oxidizer supply port (10d); and a dry distillation gas output (10b) for discharging dry distillation gas generated by the pyrolysis and partial oxidation of the biomass resource on the punching plate (11) to the outside.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MATSUSHITA, KOHEI;ZE ENERGY INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsushita, Yasuharu Toyama, JP 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00