Electrolyzer apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9315911
APP PUB NO 20130043126A1
SERIAL NO

13634145

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrolyzer apparatus includes an anode tank having an anode and a cathode tank having a cathode which are provided separately from each other. The anode tank includes a feed opening for feeding electrolytic solution into the tank, an anode aeration device for feeding aeration air to the fed electrolytic solution, and a gas extraction pipe for guiding gas generated from the anode tank to outside the tank. A communication pipe allows the amount of electrolytic solution fed into the anode tank to flow into the cathode tank, and via the electrolytic solution in the communication pipe, electric conduction becomes possible between the anode and the cathode. An amount of gas generated by an electrolysis reaction inside the anode tank is discharged to the outside of the anode tank via the gas extraction pipe together with the aeration air. The electrolytic solution introduced into the cathode tank is discharged continuously.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIKO PHARMACEUTICAL CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asada, Shigeo Ibaraki, JP 14 47
Nakahara, Koichi Suita, JP 53 291
Taguchi, Kazuhiko Sakai, JP 10 25
Taura, Kouichi Osaka, JP 5 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00