Intake control valve and assembly method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9316129
APP PUB NO 20150122206A1
SERIAL NO

14532354

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An intake control valve has a body, a valve, and a shaft. The valve has a connecting portion, a first boss located at an end of the connecting portion in the rotation axial direction; and a second boss located at an other end of the connecting portion in the rotation axial direction. The body has first and second bearing portions supporting the first and second protruding portions, respectively, first and second projection portions projecting inward from inner surfaces of the first and second bearings, respectively, to slidably support the first and second bosses, respectively, and first and second insertion openings defined between one circumferential end and an other circumferential end of the first and second projection portions, respectively. The first and second projection portions partially cover the first and second bosses, respectively, in a circumferential direction of the first boss and the second boss.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-SHI AICHI 448-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hattori, Hiroaki Gifu, JP 28 346

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00