Process flow sheet for pre-treatment of high ash coal to produce clean coal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9321028
APP PUB NO 20140366432A1
SERIAL NO

14344210

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for treating coal to obtain lower ash content coal including: (i) pretreating high ash coal in a pretreatment unit with ultrasonic waves or microwaves, (ii) forming a slurry of coal fines in a solvent solution including N-Methyl-2-pyrrolidone (NMP) and one of Ethylenediamine (EDA) or Monoethanolamine (MEA), (iii) maintaining said slurry in a refluxed condition at a temperature of about 170-190° C. for a period of about 15 minutes to 2 hours; (iv) separating the refluxed slurry into two parts consisting of extract and residue by coarse filtration, (v) recovering up to 85% of the solvent solution by evaporation of the extract to form a concentrated extract, (v) precipitating the coal by adding water to the concentrated extract, (vi) separating the coal from the water-extract solution by filtration, and (vii) recovering the rest of the solvent by distillation of the water-extract solution.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TATA STEEL LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Banerjee, P K Jamshedpur, IN 2 1
Sharma, D K New Delhi, IN 1 1
Vimal, Kumar Chandaliya Jamshedpur, IN 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 26, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00