Method and system for power management for a frequency synthesizer in a GNSS receiver chip

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9322924
APP PUB NO 20100149033A1
SERIAL NO

12352346

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A frequency synthesizer in a GNSS receiver chip enables duty cycling operation of the frequency synthesizer. The frequency synthesizer is cycled on to generate required clock signals for the GNSS receiver chip, and cycled off during a measurement duty cycle comprising measurement available intervals and measurement unavailable intervals. A reference clock inputted to the frequency synthesizer is on during the measurement duty-cycle. During the measurement available intervals, the frequency synthesizer is cycled on to generate the required clock based on the reference clock. During the measurement unavailable intervals, the frequency synthesizer is cycled off and clock timing is maintained based on the reference clock. A number of elapsed clock cycles of the reference clock is captured for a measurement unavailable interval and transferred to a clock offset. The GNSS receiver chip processes signals received using the required clock and the clock offset in a following measurement available interval.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abraham, Charles Los Gatos, US 266 9297

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00