Structures formed using monocrystalline silicon and/or other materials for optical and other applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9323010
APP PUB NO 20130177274A1
SERIAL NO

13454713

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To fabricate an interposer for interfacing waveguides (e.g. optical fiber cables) to transducers, a cavity (410) is formed in a top surface of a substrate. A first layer (520) is formed over the cavity's bottom surface, with one or more gaps in the first layer's top surface. A second layer (3410) is formed in the one or more gaps. The second layer overlaps the first layer. At least part of the first layer is removed to form channels separated from each other by portions of the second layer that are located in the one or more gaps; at least part of the first layer is removed from under the second layer. The second layer portions in the one or more gaps provide one or more spacers in the cavity; these one or more spacers at least partially cover the channels. Waveguides can be placed into the channels.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INVENSAS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kosenko, Valentin Mountain View, US 15 268
McBain, Edward Lee Scottsdale, US 2 34
Monadgemi, Pezhman Fremont, US 43 1085
Savastiouk, Sergey Saratoga, US 36 2611
Uzoh, Cyprian Emeka San Jose, US 330 9133

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00