Multiple power source unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9323299
APP PUB NO 20140058576A1
SERIAL NO

13595062

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power unit including multiple generators supplies power to a load or loads that may be variable. The generators can differ, e.g., in generating capacities, rates at which their outputs can be changed, maintenance requirements, and/or different energy-conversion efficiencies. A control unit throttles the generators independently according to a digitally implemented algorithm that may, but need not, use the difference(s) in supplying power to the load. In some cases, the controller regulates monitored power delivered to the load or loads. A power combiner is connected to the outputs of the generators. If desired, a buffer can be used between the generators and the load or loads to provide energy storage that can allow for the load or loads to change at a faster rate than the generators are throttled and for peak loads that temporarily exceed the capacity of the generators.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GREEN LIGHT INDUSTRIES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jackson, Gerald Peter West Chicago, US 16 59
Phillips, Thomas J Chapel Hill, US 7 25
Zlotnicki, Joseph Matthew Downers Grove, US 6 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00